FCC Recycling (UK) Limited: Drumgray Energy Recovery Centre – PPC Permit application

Closes 28 Jun 2021

Opened 1 Jun 2021

Overview

It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations.

Application details

We received an application from FCC Recycling (UK) Limited for a permit to operate an installation at Drumgray Energy Recovery Centre, Meikle Drumgray Road, Greengairs, Airdrie, ML6 7TD to process non-hazardous waste in an Energy from Waste (EFW) Facility to generate electricity.

A summary of their application is available below:

Why we are consulting

SEPA has assessed the application and has drafted new permit conditions. These, along with the decision document, are available below:

This is your opportunity to let us know your views on the proposed conditions.

Your comments will be published unless you ask us not to, in which case we will publish a note saying that we received a response but have not made it publicly available.

Have your say – by entering the consultation survey, you agree for your data to be used in accordance with our privacy policy.

Audiences

  • Local Authorities
  • Industry
  • Pollution Prevention and Control (PPC)
  • Public
  • Water
  • Air
  • Waste
  • Land

Interests

  • Regulated activities