Earls Gate Energy Centre Limited - PPC Variation Application

Closed 26 Aug 2021

Opened 29 Jul 2021

Results updated 1 Sep 2021

SEPA has issued a variation to Earls Gate Energy Centre Limited following their application to vary Permit PPC/A/1157446 following consultation, on 30 August 2021.

Files:

Overview

It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations.

Application details

We received an application from Earls Gate Energy Centre Limited, to vary their existing PPC Permit PPC/A/1157466 at Earls Road, Grangemouth, FK3 8XG. A summary of their application is available below:

Non-Technical Summary

Why your views matter

SEPA has assessed the application and has drafted new permit conditions. These, along with the decision document, are available below:

This is your opportunity to let us know your views on the proposed conditions. The consultation will be open for 28 days from date of publication. SEPA will consider any comments received between 29 July and 26 August 2021 before issuing the final decision.

Your comments will be published unless you ask us not to, in which case we will publish a note saying that we received a response but have not made it publicly available.

What happens next

SEPA will consider any comments received during the consultation period between 29 July and 26 August 2021 before issuing the final decision. If no comments are received, SEPA will issue the final decision no later than 2 September 2021 and issued documents will be published here. 

If you have any queries, please contact registry@sepa.org.uk

Audiences

  • Local Authorities
  • Industry
  • Pollution Prevention and Control (PPC)
  • Public
  • Water
  • Air
  • Waste
  • Land

Interests

  • Regulated activities