Call for Evidence : ​Non Waste Anaerobic Digestion over 100 tonnes per day: Permit technical requirements ​

Closes 9 Jan 2026

BAT 12

 

 

In order to prevent or, where that is not practicable, to reduce odour emissions, BAT is to set up, implement and regularly review an odour management plan, as part of the environmental management system (see BAT 1), that includes all of the following elements:

Compliance Status:

— a protocol containing actions and timelines; 
— a protocol for conducting odour monitoring as set out in BAT 10; 
— a protocol for response to identified odour incidents, e.g. complaints; 
— an odour prevention and reduction programme designed to identify the source(s); to characterise the contributions of the sources; and to implement prevention and/or reduction measures. 17.8.2018 EN Official Journal of the European Union L 208/55 

Please include link or reference to supporting documentation.  If the BAT Conclusion is not applicable, please explain why. Applicable – all non-waste AD sites will require to set up and implement an Odour Management Plan (OMP)

Upload any supporting information. Please include the Permit number and installation name in the header.

Please make sure your file is under 25MB