Call for Evidence : ​Non Waste Anaerobic Digestion over 100 tonnes per day: Permit technical requirements ​

Closes 9 Jan 2026

BAT 11

BAT is to monitor the annual consumption of water, energy and raw materials as well as the annual generation of residues and waste water, with a frequency of at least once per year.

 

Monitoring includes direct measurements, calculation or recording, e.g. using suitable meters or invoices. The monitoring is broken down at the most appropriate level (e.g. at process or plant/installation level) and considers any significant changes in the plant/installation.

Compliance Status:

Upload any supporting information. Please include the Permit number and installation name in the header.

Please make sure your file is under 25MB