Find activities

216 results

  • Flood Risk Management Plan: Outer Hebrides Local Plan District consultation

    This is the consultation hub for the Outer Hebrides Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and Outer Hebrides Local Flood Risk Management Plan, led by Comhairle nan Eilean Siar Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the... More
    Closed 31 October 2021
  • Flood Risk Management Plan: Shetland Local Plan District consultation

    This is the consultation hub for the Shetland Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Shetland Local Flood Risk Management Plan, led by Shetland Islands Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan... More
    Closed 31 October 2021
  • Flood Risk Management Plan: Solway Local Plan District consultation

    This is the consultation hub for the Solway Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Solway Local Flood Risk Management Plan, led by Dumfries and Galloway Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan... More
    Closed 31 October 2021
  • Flood Risk Management Plan: Tay Estuary and Montrose Basin Local Plan District consultation

    This is the consultation hub for the Tay Estuary and Montrose Basin Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and theTay Estuary and Montrose Basin Local Flood Risk Management Plan, led by Angus Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background... More
    Closed 31 October 2021
  • Flood Risk Management Plan: Tay Local Plan District consultation

    This is the consultation hub for the Tay Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Tay Local Flood Risk Management Plan, led by Perth and Kinross Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District and... More
    Closed 31 October 2021
  • Flood Risk Management Plan: Tweed Local Plan District consultation

    This is the consultation hub for the Tweed Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Tweed Local Flood Risk Management Plan, led by Scottish Borders Council. The consultation is being delivered in two phases.  Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District... More
    Closed 31 October 2021
  • Flood Risk Management Plans 2021-27: Strategic Environmental Assessment

    This is the consultation for the environmental report for the 14 draft flood risk management plans, covering the period 2021 to 2027, that set out the future direction and priorities for managing flooding in Scotland. The environmental report presents the results of a strategic environmental assessment (SEA) carried out as part of the preparation of the flood risk management plans. More
    Closed 31 October 2021
  • MOWI Scotland Limited: Maclean's Nose CAR Application

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 29 October 2021. Application details We received an application from... More
    Closed 29 October 2021
  • MOWI Scotland Limited: Noster CAR Application

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 14 October 2021. Application details We received an application from... More
    Closed 14 October 2021
  • MOWI Scotland Limited: Seaforth CAR Application

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 14 October 2021. Application details We received an application from Mowi... More
    Closed 14 October 2021
  • Loch Long Salmon: Beinn Reithe CAR Application

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 13 October 2021. Application details We received an application from Loch... More
    Closed 13 October 2021
  • MOWI Scotland Limited: Grey Horse Channel Outer

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 7 October 2021. Application details We received an application from... More
    Closed 7 October 2021
  • MOWI Scotland Limited: Grey Horse Channel

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 7 October 2021. Application details We received an application from... More
    Closed 7 October 2021
  • Monitoring the Mossmorran Complex

    We recently held four online events to allow members of the public to have their say on the future of monitoring at the Mossmorran complex in Fife. These events were hosted by SEPA, in partnership with Fife Council and the Health and Safety Executive (HSE). Local communities were invited to join us in a series of online information events which: Explained the role of SEPA and other public bodies in the regulation of the Mossmorran complex Explained how air quality, noise and... More
    Closed 6 October 2021
  • Fife Council: Lower Melville Wood Landfill - PPC variation application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Fife Council to vary their existing PPC permit (PPC/E/0020085) at Lower Melville Wood Landfill, Giffordtown, Ladybank, Cupar, Fife, KY15 7UL. A summary of their... More
    Closed 27 September 2021
  • Mersen Scotland Holytown Limited - PPC Variation Application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Mersen Scotland Holytown Limited, 11 Woodside, Eurocentral, Holytown, ML1 4XL to vary their existing PPC permit (PPC/A/1018364). A summary of their application is... More
    Closed 15 September 2021
  • Earls Gate Energy Centre Limited - PPC Variation Application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Earls Gate Energy Centre Limited, to vary their existing PPC Permit PPC/A/1157466 at Earls Road, Grangemouth, FK3 8XG. A summary of their application is available below: Non-Technical Summary More
    Closed 26 August 2021
  • Hewitt Farming Limited: Heads Inn free range poultry unit PPC permit application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Hewitt Farming Limited, Heads Inn Poultry Farm, Edinburgh Road, Carnwath, South Lanarkshire for a new permit to operate an installation to i ntensively rear 64,000 free range... More
    Closed 21 July 2021
  • Collier Quarrying and Recycling Limited: Goathill Quarry - PPC permit application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Collier Quarrying & Recycling Limited for a permit to operate an installation at Goathill Quarry, Easter Bucklyvie, Cowdenbeath, Fife, KY4 8ES to store and treat Incinerator Bottom... More
    Closed 14 July 2021
  • The Scottish Salmon Company Limited: North Arran CAR Application

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 5 July 2021. Application details We received an application from The... More
    Closed 5 July 2021
  • FCC Recycling (UK) Limited: Drumgray Energy Recovery Centre – PPC Permit application

    It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from FCC Recycling (UK) Limited for a permit to operate an installation at Drumgray Energy Recovery Centre, Meikle Drumgray Road, Greengairs, Airdrie, ML6 7TD to process non-hazardous... More
    Closed 28 June 2021
  • The draft river basin management plan for Scotland 2021 - 2027

    The river basin management plan (RBMP) sets out how Scottish Government, SEPA, other responsible authorities and partners work together to protect and improve the water environment in Scotland. The plan aims to prevent deterioration and improve the quality of the water environment to at least good condition. The plan is prepared by SEPA and approved by Scottish ministers. The draft plan is structured around how RBMP can help deliver Scotland’s environment strategy,... More
    Closed 25 June 2021
  • A consultation on the River Basin Management Plan for the Solway Tweed River Basin District: 2021 Update

    We are asking for your feedback on the proposed update to the Solway Tweed river basin management plan. Your responses to this consultation will help ensure that SEPA and the Environment Agency coordinates our work to ensure the updated plan supports a green economy, wildlife and habitats and the health and well-being of local communities. This consultation provides you with an overview of the plan for the Solway Tweed River Basin District. It highlights the challenges... More
    Closed 25 June 2021
  • Water resources management plan consultation

    Everyday the Scottish Environment Protection Agency (SEPA) works to protect and enhance Scotland’s environment, helping communities and businesses thrive within the resources of our planet. This is the basis of One Planet Prosperity – Our Regulatory Strategy . This strategy sets out ways we will work in partnership with businesses, through a sector approach, helping them reduce their use of water, energy and materials and minimise waste production. The strategy also... More
    Closed 4 June 2021
  • Scottish Sea Farms Limited: Shuna MPFF, Loch Linnhe CAR consultation

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 4 June 2021. Application details We received an application from... More
    Closed 4 June 2021
  • Consultation under Industrial Emissions Directive

    Operators of Part A activities require a permit issued by SEPA under the Pollution Prevention and Control (Scotland) Regulations 2012 (PPC) in order to be able to undertake their activities. SEPA, through regulation, will maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations and then by ensuring that operators comply with these conditions. Under the Industrial Emissions Directive , we publicly consult... More
    Opened 1 June 2021
  • Dawnfresh: Little Cumbrae CAR consultation

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 28 May 2021. We aware that a number of people have not been in a position to access our online... More
    Closed 28 May 2021
  • Dawnfresh: Cumbrae CAR consultation

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 28 May 2021. We aware that a number of people have not been in a position to access our online... More
    Closed 28 May 2021
  • Dawnfresh: South Bute CAR consultation

    It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 28 May 2021. We aware that a number of people have not been in a position to access our online... More
    Closed 28 May 2021
  • Consultation on the hydro abstraction scheme charges

    This consultation document outlines the proposed changes for the subsistence fees we charge under The Environmental Regulation (Scotland) Charging Scheme for hydro-electric installations regulated by SEPA under the Water Environment (Controlled Activities) (Scotland) Regulations 2011 for abstraction charges. It sets out, how these revised charges have been developed, and how you can respond to this consultation. These changes will amend the Environmental Regulation (Scotland)... More
    Closed 30 April 2021
216 results. Page 5 of 8