APP2026-00002817 - Total Waste Management Alliance Limited: Unit 12, Dales Industrial Estate, Peterhead - EASR Variation
Overview
Anyone who carries out an industrial activity under The Environmental Authorisations (Scotland) Regulations 2018 (EASR) must have an authorisation from SEPA. When we receive an application for a new industrial activity or to modify an existing industrial activity, as part of our determination we will consider the risks to the environment and human health. If we decide to grant an authorisation it will include conditions to:
- Prevent or, where that is not practicable, minimise environmental harm;
- Prevent and limit the consequences of accidents which could have an impact on the environment, and;
- Use resources in a sustainable way.
The person authorised to carry on the activity must do so in accordance with the conditions of the authorisation.
We may also review the conditions of an existing authorisation from time to time to make sure they are still effective in achieving these aims.
Application details
We have received an application from Total Waste Management Alliance Limited to vary their existing authorisation PPC/A/1000175 at Unit 12, Dales Industrial Estate, Peterhead, Aberdeenshire, AB42 3JF to include recently installed and future odour mitigations and to reflect the reconfiguration of the site infrastructure.
A summary of their application is available below:
- Activity form P-IND-IA2V
- 6.2.8 Systematic Emissions Sewer Assesment Monitoring Plan and Methodology v4
- Odour Assessment - TWMA Peterhead
- ASR Update PHD Complete
- Noise Mitigation plan following 2025 NIA V3
- Odour Management Plan TWMA Peterhead 2026 V2
- Simplified Site Process Flow
- Thermal Oxidiser Optioneering Report V5
- Thermal Oxidiser Technical Note
- Trade Effluent Direction 4140A Effective 25.08.25
- TWM001_PPC-PPC_A1_017288_Dec_2025_MR_V1
- TWMA Dales Industrial Estate_Site Investigation Design
- TWMA Environmental Permit Noise Impact Assessment
Why your views matter
This is your opportunity to let us know your views on the application. The consultation will be open for 28 days from date of publication. We will consider any comments received between 08 October and 05 November 2026 before issuing the final decision.
Your comments will not be published on our public register unless you request us to do so.
Have your say - by entering the consultation survey, you agree for your data to be used in accordance with our privacy policy.
Areas
- All Areas
Audiences
- EASR
Interests
- Permit application
Share
Share on Twitter Share on Facebook