212 results
-
Advertised applications under the Water Environment (Controlled Activities) (Scotland) Regulations 2011
Operators who require to carry out certain activities in and around the water environment for pollution control, abstraction, impoundment and engineering require an authorisation issued by SEPA under the Water Environment (Controlled Activities) (Scotland) Regulations 2011 to undertake their activities. SEPA, through regulation, will maintain a high-quality environment by setting authorisation conditions which limit the impacts associated with these activities and then by ensuring... MoreOpened 4 April 2022 -
MOWI Scotland Limited: Cairidh MPFF CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 1 April 2022. Application details We received an application from MOWI... MoreClosed 1 April 2022 -
MOWI Scotland Limited: Maol Ban MPFF CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 1 April 2022. Application details We received an application from MOWI... MoreClosed 1 April 2022 -
MOWI Scotland Limited: Sconser Quarry MPFF CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 1 April 2022. Application details We received an application from MOWI... MoreClosed 1 April 2022 -
MOWI Scotland Limited: Soay Sound CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 31 March 2022. Application details We received an application from... MoreClosed 31 March 2022 -
Dounreay Site Restoration Limited application to vary permit EAS/P/1173599
It is part of SEPA’s remit to regulate the disposal of radioactive substances within Scotland, we do this through the issuing of permits. These permits regulate the quantity and activity of waste which may be disposed of to a disposal facility over its operational lifetime. Dounreay Site Restoration Limited (DSRL) operate the Low Level Radioactive Waste Disposal Facility adjacent to the Dounreay Nuclear site in accordance with a radioactive substances permit. This... MoreClosed 25 March 2022 -
MOWI Scotland Limited: Loch Hourn CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 18 March 2022. Application details We received an application from... MoreClosed 18 March 2022 -
Proposals for a risk-based framework for managing interaction between sea lice from marine finfish farm developments and wild Atlantic salmon in Scotland
Scotland is renowned worldwide for the quality of its rivers, lochs and seas. Despite this, in nearly 60% of salmon rivers across Scotland, including on the West Coast and Western Isles, salmon populations are in poor conservation status. Twelve groups of high-level pressures on the status of salmon stocks have been identified, one of which includes sea lice from marine finfish farms. The Scottish Government has confirmed SEPA as the lead body responsible for... MoreClosed 14 March 2022 -
Leven's Unexpected Garden
Dandelion is an ambitious creative programme running from April to September 2022 that demonstrates the power of collective action in a major ‘grow-your-own’ initiative. Dandelion is inviting everyone to sow, grow and share – not just food, but music, scientific knowledge and ideas. Rooted in Scotland, with an international outlook and sustainability at its heart, the Dandelion programme follows the arc of the growing season, from April to September, and will culminate in hundreds... MoreClosed 10 March 2022 -
Grahams Dairies Limited: Airthrey Kerse Dairy, Bridge of Allan - permit application
It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Grahams Dairies Limited for a permit to operate an installation PPC/A/1198070 at Airthrey Kerse Farm, Henderson Street, Bridge of Allan, FK9 4RW to treat and process milk. ... MoreClosed 4 March 2022 -
Celtic Renewables Grangemouth Plc - Caledon Green Exemplar Plant
It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Celtic Renewables Grangemouth Plc for a new permit (PPC/A/1193001) to operate an installation at Caledon Green, Earls Gate Park, Grangemouth, FK3 8TR A summary of... MoreClosed 22 February 2022 -
SSF Shetland Limited: Easter Score Holm MPFF CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 1 February 2022. Application details We received an application from... MoreClosed 1 February 2022 -
SSF Shetland Limited: West of Burwick MPFF CAR Application
It is part of SEPA’s remit to protect the marine environment. We regulate finfish farms through permits that limit the pollutants discharged to the water environment and, where appropriate, the amount of water which can be abstracted. If you have an interest in this application please tell us by completing the following questions and submitting them to us by 1 February 2022. Application details We received an application from ... MoreClosed 1 February 2022 -
SEM Energy Ltd: ANSS Greenhead Base, Gremista, Lerwick, Shetland - PPC Variation Application
It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from SEM Energy Ltd to vary their existing PPC permit PPC/A/1103677 at ANSS Greenhead Base, Gremista, Lerwick, Shetland, ZE1 0PY to carry out the ensiling and storage of fish waste. ... MoreClosed 23 January 2022 -
BrewDog Plc: Ellon Brewery - PPC Permit Application
It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A regulations. Application details We received an application from Brewdog Plc for a permit to operate an installation at Balmacassie Industrial Estate, Ellon, AB41 8BX to treat organic waste produced by the brewing process using an anaerobic... MoreClosed 12 January 2022 -
MacLean Eggs: Hutton Hall Barns - PPC variation application
Overview It is part of SEPA’s remit to maintain a high-quality environment by setting permit conditions which limit the impacts associated with installations operating under Pollution Prevention and Control (PPC) Part A Regulations. Application details We received an application from MacLean Eggs to vary their existing PPC Permit PPC/A/1159728 at Hutton Hall Barns, Hutton, Berwick Upon Tweed, TD15 1TT to increase bird numbers by 50% and... MoreClosed 10 December 2021 -
Application information: Killoch Energy Recovery Park EfW application
Application details On 21 September 2021 SEPA received an application from Barr Environmental for an energy from waste (EFW) facility at Ochiltree, Cumnock. This activity would be regulated under the Pollution Prevention and Control (Scotland) Regulations 2012 (commonly known as PPC). The initial four week public consultation on the application started on 5 October 2021. A further consultation will be undertaken by SEPA on any draft permit variation to operate the facility. The... MoreClosed 3 November 2021 -
Flood Risk Management Plan: Highland and Argyll Local Plan District Consultation
This is the consultation hub for the Highland and Argyll Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Highland and Argyll Local Flood Risk Management Plan, led by Highland Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the... MoreClosed 31 October 2021 -
Flood Risk Management Plans and Local Flood Risk Management Plans
This is the consultation hub for Scotland’s draft flood risk management plans (previously called the flood risk management strategies) and local flood risk management plans. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for Local Plan Districts and Potentially Vulnerable Areas (PVAs)... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Ayrshire Local Plan District consultation
This is the consultation hub for the Ayrshire Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and Ayrshire Local Flood Risk Management Plan, led by North Ayrshire Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Clyde and Loch Lomond Local Plan District consultation
This is the consultation hub for the Clyde and Loch Lomond Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Clyde and Lomond Local Flood Risk Management Plan, led by Glasgow City Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Findhorn, Nairn and Speyside Local Plan District consultation
This is the consultation hub for the Findhorn, Nairn and Speyside Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Findhorn, Nairn and Speyside Local Flood Risk Management Plan, led by The Moray Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Forth Estuary Local Plan District consultation
This is the consultation hub for the Forth Estuary Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Forth Estuary Local Flood Risk Management Plan, led by Falkirk Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Forth Local Plan District consultation
This is the consultation hub for the Forth Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and Forth Local Flood Risk Management Plan, led by Stirling Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District and... MoreClosed 31 October 2021 -
Flood Risk Management Plan: North East Local Plan District consultation
This is the consultation hub for the North East Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and North East Local Flood Risk Management Plan, led by Aberdeenshire Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Orkney Local Plan District consultation
This is the consultation hub for the Orkney Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and Orkney Local Flood Risk Management Plan, led by North Orkney Islands Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan District... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Outer Hebrides Local Plan District consultation
This is the consultation hub for the Outer Hebrides Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and Outer Hebrides Local Flood Risk Management Plan, led by Comhairle nan Eilean Siar Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Shetland Local Plan District consultation
This is the consultation hub for the Shetland Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Shetland Local Flood Risk Management Plan, led by Shetland Islands Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Solway Local Plan District consultation
This is the consultation hub for the Solway Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and the Solway Local Flood Risk Management Plan, led by Dumfries and Galloway Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background information for the Local Plan... MoreClosed 31 October 2021 -
Flood Risk Management Plan: Tay Estuary and Montrose Basin Local Plan District consultation
This is the consultation hub for the Tay Estuary and Montrose Basin Flood Risk Management Plan (previously called the flood risk management strategies) led by SEPA and theTay Estuary and Montrose Basin Local Flood Risk Management Plan, led by Angus Council. The consultation is being delivered in two phases. Phase one of the consultation opened on the 21 December 2020 with draft information for the flood risk management plans available for review. This consisted of background... MoreClosed 31 October 2021
212 results.
Page 4 of 8